At D.J. Maltese, "Construction Management" is our specialty. Our firm has an
extensive track record of successfully managing our projects utilizing this approach.
Most of our work is performed within the Construction Management delivery system
because this approach fosters a healthy, positive relationship among the team (Owner,
Architect and Construction Manager). This relationship provides a "check and balance"
system permitting major design decisions to be made on the basis of cost, quality and
schedule implications as well as aesthetics and functionality. Construction Management
maximizes the opportunity to deliver the highest quality project at the lowest cost in
the shortest time.
Construction Management differs from the traditional General Contracting in several
important ways. The most significant difference is that the Construction Manager
represents the Owner and sits on the Owner's side of the table. General Contracting is
a cost-driven delivery system with any savings derived belonging to the General
Contractor. It encourages adversarial relationships, can foster costly claims, and may
sacrifice the quality of the product rendered to the Owner. While General Contracting
may provide the lowest first cost, the final cost of construction is usually lower with
a Construction Management delivery system.
Some differences between General Contracting and Construction Management include the
following:
1. Value Engineering
General Contracting Not provided.
Construction Management
Provided early in design development to prevent delay and redesign costs.
2. Schedule
General Contracting
Construction team cannot begin construction until all drawings are complete and the
bid, evaluation, negotiation, and award process is complete.
Construction Management
Construction team can begin work PRIOR to drawing completion allowing the work to be
done on a Fast Track basis, reducing the overall project schedule by up to 20%.
3. Procurement
General Contracting
All trade bids are taken in a few short hours, just before the time they are due. As a
result of the timetable for collecting bids, errors may occur. In many instances, this
method later causes requests for change orders. In addition, trade contractors may not
bid every General Contractor. Hence, the low General Contractor will NOT have the best
price for each trade.
Construction Management
The bidding process is deliberate and controlled, because trade bids are taken in
packages (as required) to meet the schedule. Bidders can be prequalified; the bids
reviewed thoroughly prior to award, and claim-prone firms can be screened prior to
bidding.
4. Phased Construction
General Contracting
Phased construction is usually not possible - if it is, it is only at a somewhat higher
cost.
Construction Management
This method works well in a Phased Project since it is very flexible.
5. Quality Control
General Contracting
Since Quality Control under a General Contractor will affect the profitability of the
project; it may not be strictly implemented or may lead to conflicts about contract
requirements and claims.
Construction Management
Since the Construction Manager can prequalify trade contractors, and work early with
the Architects and Engineers to enhance constructability, the opportunity to maximize
quality is greatly improved.
With the early involvement of a Construction Manager, the Owner optimizes the
probability of a successful project that reflects its values and its priorities. Once
the decision is made to proceed on a Construction Management basis, then the next task
is:
Selecting the Right Company for the Construction Project.
A guide prepared by Dominic J. Maltese, Jr., CPE
Selecting the right company for a construction project can be challenging and
difficult. What to look for in a Construction Manager? How to determine which company
to interview? What form of agreement to use? How to evaluate companies and make that
final decision?
Construction customers are very often business owners, operators, or managers, with a
full-time job running the business, and have minimal amounts of time available to spend
in depth on the project. They are often not well versed in many detailed issues that
can, and do, arise in the course of a construction project. For these reasons and more,
the selection of the right Construction Manager is of great importance
To begin the selection process, the Owner should identify the scope of work to be
performed, in construction type and in dollars. The Owner must set the values and
priorities for the Construction Team setting realistic and attainable targets for Cost,
Quality, and Schedule. Construction Managers with experience in this type of project,
or expertise in critical aspects of the project, can then be identified. Developing a
list of "candidate" Construction Managers is the next step. Professional acquaintances
who have had construction work performed is one source, local professional associations
such as the Associated General Contractors (a misnomer - most members perform
Construction Management services) is another.
An initial list of five to seven candidates is adequate and not too large to handle
effectively. From this initial list, obtain information on the company such as how long
have they been in business, a list of projects and references, and information on the
proposed project team members - what professional certifications do they have, special
training such as Value Engineering, and the like. Evaluate this information against the
needs of the project and the Owner's values. Select two or three firms to interview in
some depth.
The firm selected should be right sized to provide the service the Owner requires. A
firm that has a record of offering a highly qualified project team and then moving them
to another project ('bait and switch") should not be selected. Is the project team
proposed available to start the project when needed? Once the ability to actually do
the project is established, then much of the final selection will depend on who the
Owner trusts and feels comfortable with. These are not unimportant criteria.
Design/Build Services
D. J. Maltese offers a complete range of construction services, including performing as
Design/Build contractor for the projects. Typically, the Design/Build delivery system
is appropriate when:
- The Owner requires a single source of responsibility for the project.
- Faster delivery of the project is required.
- The Owner has a clear vision of the project and desires one party to be
responsible for carrying it to completion.
- Value Engineering and Constructability are enhanced by integration of the
design and construction processes.
Maltese Construction LLC has the capability to develop conceptual design with its own
staff (with two Certified Professional Estimators on staff), can readily develop
accurate estimates and schedules to move the project quickly through the
pre-construction phase into full production.
|